I’ve very thrilling information! The counter tops within the lavatory will likely be put in on MONDAY! I’m so excited. I really feel like a child on Christmas Eve. I imply, this lavatory mission has been occurring for therefore lengthy now (a reality for which I make no apologies contemplating that Matt and I lastly have a life outdoors of our home now after over a decade, and we’re each having fun with it to the fullest), however the set up of the counter tops will actually really feel like this mission is formally winding down.
So I went again to the final “to do” record that I made for this lavatory to see simply how far I’ve come, and precisely what nonetheless must be accomplished. I initially made the record in April, after which I reevaluated the record in July and checked off a number of issues that I had gotten accomplished by then. And right here’s the state of the record now…
- End the crown molding and trim across the mural wall — sand, caulk, prime, and paint (Executed!)
- Set up the final row of tiles across the ceiling within the bathe (Executed!)
- Set up the door between the toilet and residential gymnasium (Executed!)
- Trim out that door (Executed!)
- Construct two vanities (Executed!)
- Construct the “dresser” between the vanities (Executed!)
- Make the “chandelier” and set up above the tub (Executed!)
- Construct the cupboard for the bathroom space (Executed!)
- Paint the partitions and ceiling in the bathroom space (Executed!)
- Set up baseboards in the bathroom space — caulk, prime and paint (Executed!)
- Have the tub, tub faucet, and bathroom put in (Executed!)
- Grasp bathe curtain within the bathe (Executed!)
- Order counter tops for vanities (Executed!)
- Have the sinks put in (Will likely be accomplished on Monday)
- End the plumbing on the sinks (Hopefully will likely be accomplished on Monday)
- Set up the wainscoting on the decrease partitions (In progress!)
- End the entire remainder of the trim (doorways, window, wainscoting) — wooden fill, sand, caulk, prime, and paint
- Grasp the opposite vainness mirror
- Resolve on privateness (window remedies? glass movie?) for the window and doorways (Executed!)
Right here’s what all the pieces appears to be like like going into this weekend, and as I depend down this remaining few days of engaged on this lavatory mission.
The bathe has been principally accomplished for some time now. It’s completely practical as it’s, however I nonetheless must hem the bathe curtains in order that they’re not puddling on the ground.
And all the pieces must be cleaned, clearly. The ground isn’t that brown. That’s simply mud. 😀 There’s a coating of mud on all the pieces on this room, so all the pieces must be cleaned.
In the principle space, I’m actually right down to wainscoting (which can embrace a tile accent) and trim. And as soon as I lastly get the door painted and get that plastic off of the glass panes, I’ll be including privateness movie to the glass on each doorways within the room.
Then there are the smaller particulars, like putting in sconce shades, hanging the opposite mirror, putting in change plates and outlet covers, and so forth.
The drawers on the storage cupboard nonetheless want a second sanding and a second coat of Rubio Monocoat. The perimeters of the cupboard and the vanities have already been accomplished.
The bathroom space is completed. It simply must be cleaned very well because it additionally has a coating of mud on all the pieces.
And I must get the vent cowl on the A/C vent within the ceiling.
On the opposite aspect, I don’t have fairly as a lot accomplished on the wainscoting, however no less than there’s a little bit of progress.
And when you can’t see it, I would like to vary the trim on the ground behind the tub. I had initially used an everyday shoe molding, however after I was engaged on the water closet, I made a decision that shoe molding wasn’t going to chop it, so I upgraded to a a lot nicer trim to go alongside the ground. I nonetheless haven’t modified it behind the bathtub. That may require uninstalling the tap and transferring the tub out of the best way, which is exactly why I’ve been placing that off. 😀
So aside from the wainscoting and the second coat of Rubio Monocoat on the storage cupboard, the remaining is only a bunch of small, annoying initiatives that appear like they need to be very fast and straightforward to complete, and but they take up a lot time and make the tip of a room rework drag on for what looks like without end.
However, oh my goodness, Monday will likely be an thrilling day! Counter tops, then sinks, then plumbing, after which the entire plumbing on this room will really be practical. It’ll really feel like an actual, precise lavatory! 😀
Addicted 2 Adorning is the place I share my DIY and adorning journey as I rework and adorn the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do nearly all of the work on the home on my own. You may be taught extra about me right here.
I hope you’ll be part of me on my DIY and adorning journey! If you wish to observe my initiatives and progress, you possibly can subscribe beneath and have every new put up delivered to your electronic mail inbox. That method you’ll by no means miss a factor!