Wednesdays are my “no work” days, however I did take a second to take stock of the remaining tasks within the room. My authentic objective was to get this room completed by the tip of February. Will I make my objective? Properly, let’s check out what nonetheless must be accomplished.
First, these transition strips nonetheless want work. I’ve determined to stain them to match the carpet, in order that ought to be fast and simple.
Your entire perimeter of the room, nonetheless wants quarter spherical.
I don’t need the curtains to be pooled on the ground, so these must be hemmed. And I preserve forgetting that I’ve a ceiling fan for this room. I must get that put in.
The Swedish ladder has been assembled, however I nonetheless wish to stain the wooden bars, after which I would like to determine tips on how to connect this heavy factor securely to the wall. That shall be a problem.
Each doorways within the room nonetheless must be painted (I’m protecting them white), and the door into the toilet wants a door pull.
The closet space nonetheless doesn’t have lights (however the wiring is there), and I must make an attic scuttle gap cowl.
The shut space nonetheless wants fairly a bit of labor. I would like to determine what to do with the electrical panel. It has a canopy to go on it, however then what? Hold it that terrible grey metallic colour? Paint it?
I additionally must get a TV to go over the dresser, dangle the 2 wall mirrors flanking the dresser, and construct cabinets. I’ve modified my thoughts on the design for the cabinets, however I’ll share extra particulars later.
Within the entrance to the room, the ceiling paint nonetheless wants some touchups, and the door must be painted. I additionally want so as to add the wiring and junction field for the brand new mild, after which set up the sunshine. I wish to add art work to the partitions, and the swap plates and two extra outlet covers must be painted and put in.
The black dresser within the closet goes to get a makeover.
And eventually, I wish to paint Matt’s Theracycle (his train bike), which is an off-white colour. I would like it to be black.
That looks as if so much to do, and if I wish to meet my objective, I’ve six days to get all of it accomplished! I can’t assure that I’ll make it, however I’m certain going to strive! Right here’s the checklist in a easy-to-read format:
- Stain transition strips
- Set up and paint quarter spherical on the baseboards
- Hem the curtains
- Set up the ceiling fan
- Connect the Swedish ladder to the wall
- Paint each doorways white
- Add door pull to door between residence gymnasium and toilet
- Set up closet lights
- Make attic scuttle gap cowl
- Determine what to do with the electrical panel cowl
- Purchase TV and dangle it on the wall above the dresser
- Cling full size mirrors flanking the dresser
- Make cabinets for the closet space
- Add wiring and junction field for the sunshine within the room entrance
- Set up mild within the room entrance
- Contact up paint on ceiling within the room entrance
- Paint and set up swap plates and outlet covers
- Give the dresser a makeover
- Paint Matt’s Theracycle
Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and beautify the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do nearly all of the work on the home on my own. You possibly can be taught extra about me right here.