[ad_1]
Alright, y’all. This would be the last grasp rest room replace that I write. After this, the following submit I write about this rest room would be the last, completed rest room with the entire earlier than and after tour.
I’m not promising when that might be, however I’m hoping it will likely be earlier than Thanksgiving, which is subsequent Thursday. I’d love to return again after Thanksgiving and get proper to the house gymnasium and see if I can end that earlier than the top of the yr. That’s the objective, however I received’t be too exhausting on myself if I’ve just a few small unfinished issues in that room that want to hold over into subsequent yr.
However for now, right here’s the ultimate punch checklist for the lavatory. I nonetheless have to:
- Clear the water closet. (It’s completed, however all the pieces is roofed in mud proper now.)
- Prime and paint that one piece of trim that I maintain overlooking.
- Do some paint touchups on the remainder of the trim and wainscoting on this aspect of the room.
- Take the plastic off of the door panes and add the privateness movie.
- Add a door pull on the sting of the door.
- Cowl the sunshine and swap covers and get them put in.
- Caulk and paint the unfinished wainscoting panel beneath the vainness.
- End portray the plumbing beneath the vainness.
- End putting in the pulls on the storage cupboard.
- Paint the mirror body and hold the mirror.
- Caulk and paint the trim/backsplash.
- Set up and grout the tile backsplash/accent.
- Set up the lacking wainscoting panel beneath the vainness.
- Set up the tap and plumbing.
- Paint the plumbing elements beneath the vainness.
- Sand, caulk, prime, and paint the final part of wainscoting.
- Hem the bathe curtain.
- Caulk one space within the bathe that I ignored.
That’s the ultimate, exhaustive checklist. If I counted appropriately, that’s 18 issues left on the checklist. Fortunately, a few of these are fast and straightforward, and I can get them crossed off the checklist at this time. Others aren’t fairly so fast and straightforward, so we’ll see if I can get all of that carried out earlier than Thanksgiving!
Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and beautify the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do the vast majority of the work on the home on my own. You may study extra about me right here.
I hope you’ll be a part of me on my DIY and adorning journey! If you wish to observe my tasks and progress, you’ll be able to subscribe under and have every new submit delivered to your e-mail inbox. That approach you’ll by no means miss a factor!
[ad_2]
Source link