I began off the week sturdy with getting stuff completed on the grasp toilet, however then the week with a fizzle. I don’t work on Wednesdays, after which yesterday, I needed to go to the attention physician and get my eyes dilated so she may do a radical examination. Since I had by no means had my eyes dilated earlier than, she stated she wouldn’t order extra contacts for me till she may do this examination. So I obtained there shiny and early, had my eyes dilated, obtained the examination (the whole lot regarded excellent), after which it took actually the remainder of the day (till about 6:00pm) for my eyes to get again to regular and the blurriness to go away. My eyes had been so blurry all day that I couldn’t see my laptop. I couldn’t see to measure and minimize trim for the toilet. I couldn’t do something that required me to see element up shut. So I didn’t get something finished yesterday, both!! Ugh! So irritating.
So I’ll provide you with a toilet standing report as we head into the weekend. I’m actually hoping to get fairly a bit finished this weekend, so we’ll see how that goes.
The partitions within the water closet are nonetheless underway (I shared the plan right here if you happen to missed that), and they’re nonetheless on the similar stage the place I left them on Tuesday night time. That is the place my focus will likely be this weekend, as I hope to get the remainder of the trim put in, after which get the whole lot sanded, caulked, and hopefully painted.
As soon as the partitions are finished in there, I can begin constructing the cupboard (which will likely be a separate, freestanding piece of furnishings) that can go in opposition to that again wall.
I haven’t made any extra progress on the bubble mild. Whereas the additional bubbles (ornaments) that I ordered did are available in, I additionally determined to order a ceiling medallion for the sunshine.
That is one which was really useful by a commenter on the final bubble mild publish (thanks, Alicia!!), and I completely beloved it at first sight. It’s like a whimsical solar medallion, and it’s from Wayfair. I can’t wait to get it, however it received’t be right here till subsequent week. So the sunshine is on maintain till then.
I’ve determined to maintain the ceiling white, however I’m nonetheless undecided in regards to the colour of the particular mild. I’ll wait till the medallion will get right here, after which mess around with some choices. If the medallion provides sufficient separation between the ceiling and the sunshine, then I’ll most likely depart the sunshine white. If I feel it nonetheless wants a bit of pizzazz, I’m leaning in the direction of a really mild blush pink on the bubbles. However once more, I’ll have to attend and see.
Shifting on, all the trim and the door on the outside wall are painted, however the glass on the door nonetheless must be cleaned, and I want to put in the brand new door knob and deadbolt on the door. These will likely be black, identical to on all the opposite doorways in the home.
I’m nonetheless ready on trim to reach in order that I can begin constructing the vanities and the dresser that can go between them. I discovered a spot on-line (Distinctive Wooden Designs) that sells every kind of trim in many alternative species of wooden (together with the walnut that I want), in order that’s coming from Canada, and it’ll most likely be one other week earlier than it arrives. Technically, I may go forward and construct the vanities earlier than the trim arrives, and simply add the trim afterwards. However for the dresser, due to the design, I want that order to come back in first earlier than I can begin constructing.
The bathe seems to be identical to it regarded the opposite day once I confirmed the completed bathe to you. The bathe curtain nonetheless must be hemmed, and till I get that finished (or simply take away it till it’s finished), the bathe is again to an unusable state.
After which on the opposite wall, the door main into the house health club, in addition to the casing round it, are nonetheless unfinished. All the nail holes have been wooden crammed, however I nonetheless must sand, caulk, after which paint. As soon as that’s finished, I can minimize away the plastic that’s at the moment protecting the glass panes. (The white that you just see on the glass is primer protecting the plastic that protects the panes. The producer covers the panes with plastic, after which sprays the primer, in order that’s how the doorways arrive.)
So the progress has been sluggish this week, however a minimum of there was progress! And a minimum of I now have a course for the water closet partitions. My purpose continues to be to have this room finished by the top of June, however I higher step up the tempo if I’m going to make that purpose!
Addicted 2 Adorning is the place I share my DIY and adorning journey as I rework and beautify the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do nearly all of the work on the home on my own. You may be taught extra about me right here.